Barrus manages shipment in Russian
Barrus Projects has managed to ship 23,400 freight tons of cargoes for the Gas Processing Complex within Ust-Luga Ethane-Rich Gas Processing Cluster.
The complex will become the most powerful gas processing complex in Russia in terms of volume of gas processed and will be crucially important for the social and economic development of the country.
Bulk volume – 23,400 m3; Total tonnage – 5,560 tons.
The most critical cargo: 1. Amine stripper G1-63T02– 1 pc. Dimensions: 45.6 х 5.9 х 5.4 m, 143.5 tons; 2. Depropanizer G1-44T01– 1 pc. Dimensions: 45.2 х 7.3 х 6.6 m, 313.8 tons.
Our company’s task was to deliver cargoes from Chinese manufacturing plants to Zhangjiagang/Changshu ports with subsequent transportation of the cargoes from Zhangjiagang/Changshu ports to Ust-Luga port using three derrick barges. In addition to the transportation by sea, our services included the loading of the cargo onto ships at ports of departure, as well as the development of the cargo stowage and securing projects and handling plans, as well as loading and securing cargoes on ships.
At the Ust-Luga сontainer terminal, our specialists arranged the transshipment, including moving heavy cargoes to the rear area on the company’s modular axles and the cargo stowage on support columns for temporary storage. With our own SPMT self-propelled modular axles, we were able to easily transport heavy cargoes to the gas processing plant.
Barrus Projects is grateful to our colleagues for good job and to Ruskhimaliance for their trust.














