{"id":23809,"date":"2026-09-22T11:09:14","date_gmt":"2026-09-22T11:09:14","guid":{"rendered":"https:\/\/projectcargoglobal.com\/?p=23809"},"modified":"2026-09-24T13:02:58","modified_gmt":"2026-09-24T13:02:58","slug":"snme-forms-strategic-joint-venture-with-anipsotiki","status":"publish","type":"post","link":"https:\/\/projectcargoglobal.com\/?p=23809","title":{"rendered":"SNME forms strategic Joint Venture with Anipsotiki"},"content":{"rendered":"<p><strong>Sarens Nass Middle East (SNME) has formed a strategic Joint Venture with the Greek wind installation specialist Anipsotiki, bringing together SNME&#8217;s regional lifting strength and infrastructure with Anipsotiki&#8217;s specialised wind installation expertise to serve the rapidly expanding renewable energy market across the Middle East. <\/strong><\/p>\n<p>The newly established JV has already secured its first major contract, awarded by the Chinese turbine manufacturer Goldwind, one of the world&#8217;s leading wind energy companies.<\/p>\n<p>Sarens Nass Middle East was established in 2003 as a joint venture between the Nass Group of Bahrain and Sarens NV of Belgium, bringing together two family-owned industrial groups with deep roots in their respective markets. Over two decades, SNME has grown into the operator of the region&#8217;s largest heavy lift and transport fleet, with more than 4.000 cranes and transport units serving clients across the Gulf in oil and gas, petrochemicals, infrastructure, ports and industrial projects. It is that combination of local ownership and global engineering capability that the new Joint Venture with Anipsotiki now extends into wind. &#8220;This joint venture brings together complementary strengths and a shared ambition to build lasting wind installation capabilities in the Middle East. Our first contract with Goldwind is an important step towards that ambition, combining regional scale with specialist expertise to deliver projects safely, reliably and with meaningful local participation,&#8221; said Alhanoof Sami Nass, Regional Director of Sarens Nass Middle East and Board Member of the SNME-Anipsotiki Joint Venture.<\/p>\n<p>This partnership combines SNME&#8217;s strong footprint and heavy lifting capabilities across the Middle East with Anipsotiki&#8217;s extensive experience in wind turbine installation and specialised manpower dedicated to the wind sector. Anipsotiki has successfully delivered wind projects across Europe, North Africa and the Middle East, operating in diverse terrains and regulatory environments. Its specialised wind installation teams bring deep technical knowledge, precision execution and a strong safety culture, all critical factors for the successful delivery of modern wind energy projects.<\/p>\n<p>Together, the Joint Venture holds access to more than 100 pieces of wind turbine installation equipment, including crawler cranes, mobile cranes and specialised installation tools. This combined fleet ensures flexibility, scalability and the ability to support multiple wind projects across the region simultaneously. &#8220;Anipsotiki has spent years installing wind turbines in some of the most demanding conditions in Europe, North Africa and the Middle East. What this Joint Venture adds is regional scale, the fleet, the footprint and the local presence to apply that experience across the Gulf. Goldwind is exactly the right project to start with,&#8221; said Kostas Iliadis, Project Director Wind Energy of Anipsotiki.<\/p>\n<p>For its first contract with Goldwind, the JV will deploy 58 pieces of equipment, including high-capacity crawler cranes and supporting auxiliary cranes, for the installation of tower sections, nacelles and blades. Securing this project shortly after forming the partnership is a strong validation of the JV&#8217;s technical capability, operational readiness and combined expertise in wind turbine installation.<\/p>\n<p>The Middle East is entering a decisive phase in its energy transition. Wind and solar developments across the region are expected to generate more than 150 GW of installed renewable capacity in the coming years, highlighting the scale and ambition of the region&#8217;s energy transformation.<\/p>\n<p>Through this Joint Venture, SNME and Anipsotiki combine global wind installation expertise with strong regional execution and local content capabilities, enabling turbine manufacturers and project developers to deliver large-scale renewable projects efficiently and safely. &#8220;Sarens has worked alongside the Nass family in the Middle East for more than twenty years, and that partnership is the foundation everything we do in the region is built on. This Joint Venture is the natural next step, bringing dedicated wind installation capability to the Gulf at the moment the region needs it most. As a family business, we invest for the long term, and we intend to be a lasting partner in the Middle East&#8217;s energy transition,&#8221; said Wim Sarens, CEO of Sarens Group and Board Member of the SNME-Anipsotiki Joint Venture.<\/p>\n<p>This first wind contract with Goldwind marks the beginning of what promises to be a long-term strategic collaboration, positioning the SNME-Anipsotiki Joint Venture as a key partner for wind turbine installation across the Middle East. Two industry giants working together to help power the region&#8217;s sustainable future.<\/p>\n<p>&nbsp;<br \/>\n&nbsp;<br \/>\n<div class=\"pt-cv-wrapper\"><div class=\"pt-cv-view pt-cv-grid pt-cv-colsys\" id=\"pt-cv-view-658c69ac71\"><div data-id=\"pt-cv-page-1\" class=\"pt-cv-page\" data-cvc=\"5\"><div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24135\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Bertling-20-years-Brazil-.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Bertling-20-years-Brazil-.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Bertling-20-years-Brazil-.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Bertling-20-years-Brazil-.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24136\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24136\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Bertling-20-years-Brazil-.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;4.5&quot;,&quot;camera&quot;:&quot;Canon EOS 5D Mark IV&quot;,&quot;created_timestamp&quot;:&quot;1793210868&quot;,&quot;focal_length&quot;:&quot;24&quot;,&quot;iso&quot;:&quot;1600&quot;,&quot;shutter_speed&quot;:&quot;0.008&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Bertling 20 years Brazil\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Bertling-20-years-Brazil-.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24135\" class=\"_self\" target=\"_self\" >Bertling celebrates 20 years in Brazil<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24131\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Sarens-Indonesia-2026.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Sarens-Indonesia-2026.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Sarens-Indonesia-2026.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Sarens-Indonesia-2026.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24133\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24133\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Sarens-Indonesia-2026.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Sarens Indonesia 2026\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Sarens-Indonesia-2026.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24131\" class=\"_self\" target=\"_self\" >Sarens supports installation in Indonesia<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24127\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/KAMAG-GOLDSCHMAUS.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/KAMAG-GOLDSCHMAUS.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/KAMAG-GOLDSCHMAUS.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/KAMAG-GOLDSCHMAUS.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24129\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24129\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/KAMAG-GOLDSCHMAUS.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"KAMAG GOLDSCHMAUS\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/KAMAG-GOLDSCHMAUS.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24127\" class=\"_self\" target=\"_self\" >GOLDSCHMAUS relies on KAMAG PT 201<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24125\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Vestas-New-Zealand-.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Vestas-New-Zealand-.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Vestas-New-Zealand-.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Vestas-New-Zealand-.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"22510\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=22510\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Vestas-New-Zealand-.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Vestas New Zealand\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Vestas-New-Zealand-.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24125\" class=\"_self\" target=\"_self\" >Vestas publishes third quarter results<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24112\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/PCN-MESC-.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/PCN-MESC-.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/PCN-MESC-.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/PCN-MESC-.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24113\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24113\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/PCN-MESC-.jpeg?fit=640%2C355&amp;ssl=1\" data-orig-size=\"640,355\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"PCN MESC\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/PCN-MESC-.jpeg?fit=640%2C355&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24112\" class=\"_self\" target=\"_self\" >PCN reports MESC as new members<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24117\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/CEVA-Entzheim.jpg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/CEVA-Entzheim.jpg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/CEVA-Entzheim.jpg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/CEVA-Entzheim.jpg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24118\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24118\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/CEVA-Entzheim.jpg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"CEVA Entzheim\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/CEVA-Entzheim.jpg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24117\" class=\"_self\" target=\"_self\" >CEVA opens new facility in Entzheim<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24109\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Kaleido-Logistics-marks-50-years-.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Kaleido-Logistics-marks-50-years-.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Kaleido-Logistics-marks-50-years-.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Kaleido-Logistics-marks-50-years-.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24110\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24110\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Kaleido-Logistics-marks-50-years-.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Kaleido Logistics marks 50 years\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Kaleido-Logistics-marks-50-years-.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24109\" class=\"_self\" target=\"_self\" >Kaleido marks 50th anniversary<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24105\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Changes-management-TII-Group.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Changes-management-TII-Group.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Changes-management-TII-Group.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Changes-management-TII-Group.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24106\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24106\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Changes-management-TII-Group.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Changes management TII Group\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Changes-management-TII-Group.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24105\" class=\"_self\" target=\"_self\" >Changes in management at TII Group<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24102\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Jumbo-Offshore-transport-2026.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Jumbo-Offshore-transport-2026.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Jumbo-Offshore-transport-2026.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Jumbo-Offshore-transport-2026.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24103\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24103\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Jumbo-Offshore-transport-2026.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;camera&quot;:&quot;Galaxy A16&quot;,&quot;created_timestamp&quot;:&quot;1791892465&quot;,&quot;iso&quot;:&quot;20&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Jumbo Offshore transport 2026\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Jumbo-Offshore-transport-2026.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24102\" class=\"_self\" target=\"_self\" >Jumbo Offshore completes transport and installation<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24099\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Rhenus-Zhengtong-MoU.jpg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Rhenus-Zhengtong-MoU.jpg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Rhenus-Zhengtong-MoU.jpg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Rhenus-Zhengtong-MoU.jpg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24100\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24100\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Rhenus-Zhengtong-MoU.jpg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Rhenus Zhengtong MoU\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Rhenus-Zhengtong-MoU.jpg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24099\" class=\"_self\" target=\"_self\" >Rhenus and Zhengtong Auto sign MoU<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24096\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Wallenius-Wilhelmsen-Q3-2026.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Wallenius-Wilhelmsen-Q3-2026.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Wallenius-Wilhelmsen-Q3-2026.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Wallenius-Wilhelmsen-Q3-2026.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24097\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24097\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Wallenius-Wilhelmsen-Q3-2026.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Wallenius Wilhelmsen Q3 2026\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Wallenius-Wilhelmsen-Q3-2026.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24096\" class=\"_self\" target=\"_self\" >Wallenius Wilhelmsen delivers solid Q3 results<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24085\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Balena-Iraq.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Balena-Iraq.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Balena-Iraq.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Balena-Iraq.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24086\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24086\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Balena-Iraq.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Balena Iraq\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Balena-Iraq.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24085\" class=\"_self\" target=\"_self\" >Balena coordinates transport to Iraq<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24077\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/MHSCL-Management-team-.jpg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/MHSCL-Management-team-.jpg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/MHSCL-Management-team-.jpg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/MHSCL-Management-team-.jpg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24078\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24078\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/MHSCL-Management-team-.jpg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"MHSCL Management team\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/MHSCL-Management-team-.jpg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24077\" class=\"_self\" target=\"_self\" >MHSCL appoints its Management team<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-2 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24080\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Polaris-Far-East-.jpeg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Polaris-Far-East-.jpeg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Polaris-Far-East-.jpeg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Polaris-Far-East-.jpeg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24082\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24082\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Polaris-Far-East-.jpeg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"Polaris Far East\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/Polaris-Far-East-.jpeg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24080\" class=\"_self\" target=\"_self\" >Polaris completes the first phase of Far East project<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-3 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/projectcargoglobal.com\/?p=24073\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img loading=\"lazy\" decoding=\"async\" width=\"130\" height=\"90\" src=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/K-LINE-medium-term-management-plan-.jpg?resize=130%2C90&amp;ssl=1\" class=\"pt-cv-thumbnail\" alt=\"\" srcset=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/K-LINE-medium-term-management-plan-.jpg?resize=392%2C272&amp;ssl=1 392w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/K-LINE-medium-term-management-plan-.jpg?resize=130%2C90&amp;ssl=1 130w, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/K-LINE-medium-term-management-plan-.jpg?zoom=2&amp;resize=130%2C90&amp;ssl=1 260w\" sizes=\"auto, (max-width: 130px) 100vw, 130px\" data-attachment-id=\"24074\" data-permalink=\"https:\/\/projectcargoglobal.com\/?attachment_id=24074\" data-orig-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/K-LINE-medium-term-management-plan-.jpg?fit=640%2C356&amp;ssl=1\" data-orig-size=\"640,356\" data-comments-opened=\"0\" data-image-meta=\"{&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"K LINE medium term management plan\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/11\/K-LINE-medium-term-management-plan-.jpg?fit=640%2C356&amp;ssl=1\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/projectcargoglobal.com\/?p=24073\" class=\"_self\" target=\"_self\" >K LINE formulates a medium-term management plan<\/a><\/h4><\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sarens Nass Middle East (SNME) has formed a strategic Joint Venture with the Greek wind installation specialist Anipsotiki, bringing together<\/p>\n","protected":false},"author":9,"featured_media":23810,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4],"tags":[2546,2523],"class_list":["post-23809","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news","tag-anipsotiki","tag-snme"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/paPyrk-6c1","jetpack-related-posts":[{"id":23545,"url":"https:\/\/projectcargoglobal.com\/?p=23545","url_meta":{"origin":23809,"position":0},"title":"SNME delivers high-capacity crane solutions","author":"Project Cargo Global","date":"August 11, 2026","format":false,"excerpt":"At Sohar Port, a key industrial gateway in the Middle East, precision and scale come together in the execution of the NOC Ruya PKG#12 project. Here, Sarens Nass Middle East (SNME) is playing a pivotal role by supplying high-capacity crawler cranes to support the fabrication of offshore jackets for NOC\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/08\/Sarens-Sohar-Port-Oman-SNME.jpg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/08\/Sarens-Sohar-Port-Oman-SNME.jpg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/08\/Sarens-Sohar-Port-Oman-SNME.jpg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":23789,"url":"https:\/\/projectcargoglobal.com\/?p=23789","url_meta":{"origin":23809,"position":1},"title":"Sinotrans Sarens completes weighing operation","author":"Project Cargo Global","date":"September 17, 2026","format":false,"excerpt":"Sinotrans Sarens completed the weighing operation for the Yangjiang Sanshandao 500 kV Offshore Wind Project, carrying out a 29.600-tonne converter station topside weighing for ZPMC Nantong. The one-day weighing operation formed a critical control process for the shipping, installation, and structural safety stages to follow. The operation refreshed Sinotrans Sarens\u2019\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/09\/Sinotrans-Sarens-weighing-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/09\/Sinotrans-Sarens-weighing-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/09\/Sinotrans-Sarens-weighing-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":22328,"url":"https:\/\/projectcargoglobal.com\/?p=22328","url_meta":{"origin":23809,"position":2},"title":"Sarens completes replacement in Thailand","author":"Project Cargo Global","date":"January 21, 2026","format":false,"excerpt":"Sarens has successfully completed the replacement of a wind turbine blade at the Theparak Wind Farm in Thailand, supporting the continued operation of a facility that offsets approximately 150.000 tonnes of CO\u2082 per year. Commissioned by GE Renewable Energy Thailand, the operation took place at the Theparak Wind Farm in\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/01\/Sarens-Theparak-Wind-Farm-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/01\/Sarens-Theparak-Wind-Farm-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/01\/Sarens-Theparak-Wind-Farm-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":22808,"url":"https:\/\/projectcargoglobal.com\/?p=22808","url_meta":{"origin":23809,"position":3},"title":"Sarens installs wind turbine for Vensys","author":"Project Cargo Global","date":"April 2, 2026","format":false,"excerpt":"Sarens has successfully completed a wind turbine installation project at the Popowo Stare wind farm site in Poland, delivering specialised crane services for Vensys Energy as part of the Popowo Stare II project. The project involved the installation of one Vensys V115 wind turbine with a hub height of 92,5\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/04\/Sarens-Vensys-Poland-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/04\/Sarens-Vensys-Poland-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/04\/Sarens-Vensys-Poland-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":23995,"url":"https:\/\/projectcargoglobal.com\/?p=23995","url_meta":{"origin":23809,"position":4},"title":"Qazag Green and Sarens Kazakhstan enter MoU","author":"Project Cargo Global","date":"October 22, 2026","format":false,"excerpt":"The Association of Legal Entities \u201cQazaq Green\u201d and Sarens Kazakhstan LLP have signed a Memorandum of Understanding and Cooperation aimed at supporting the development of renewable energy projects in the Republic of Kazakhstan. The document provides a framework for combining Qazaq Green\u2019s industry expertise with Sarens Kazakhstan\u2019s engineering and logistics\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/10\/Sarens-Qazag-Green-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/10\/Sarens-Qazag-Green-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/10\/Sarens-Qazag-Green-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":20988,"url":"https:\/\/projectcargoglobal.com\/?p=20988","url_meta":{"origin":23809,"position":5},"title":"Sarens powers the future","author":"Project Cargo Global","date":"August 18, 2025","format":false,"excerpt":"Sarens undertook a critical role in the development of the He Dreiht Offshore Wind Park in the Netherlands, partnering with BUSS Terminal Eemshaven to handle and marshal foundation components. This ambitious project, owned by EnBW, focuses on the logistics of transporting and positioning massive components required for the construction of\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2025\/08\/Sarens-powers-future-.jpg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2025\/08\/Sarens-powers-future-.jpg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2025\/08\/Sarens-powers-future-.jpg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/09\/SNME-Anipsotiki-.jpeg?fit=640%2C356&ssl=1","_links":{"self":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts\/23809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23809"}],"version-history":[{"count":2,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts\/23809\/revisions"}],"predecessor-version":[{"id":23836,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts\/23809\/revisions\/23836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/media\/23810"}],"wp:attachment":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}