{"id":22310,"date":"2026-01-19T11:50:12","date_gmt":"2026-01-19T11:50:12","guid":{"rendered":"https:\/\/projectcargoglobal.com\/?p=22310"},"modified":"2026-01-19T11:50:12","modified_gmt":"2026-01-19T11:50:12","slug":"prince-rupert-records-14pc-increase","status":"publish","type":"post","link":"https:\/\/projectcargoglobal.com\/?p=22310","title":{"rendered":"Prince Rupert records 14pc increase"},"content":{"rendered":"<p>The Port of Prince Rupert handled 26.3 million tonnes of cargo in 2025, a 14 percent increase over 2024, during a historic period of infrastructure investment and development.<br \/>\n\u201cOur 2025 performance reflects the consistent commitment of the Prince Rupert Gateway\u2019s workforce, terminal operators, CN, and customers. The depth of collaboration between all Gateway partners to unlock capacity, provide greater speed to market, and actively diversify the $60 billion in trade that flows through our Port annually is second to none,\u201d said Kurt Slocombe, Interim President, Prince Rupert Port Authority.<br \/>\nIntermodal traffic through DP World Prince Rupert\u2019s Fairview Container Terminal rose 20 percent year-over-year to 885,797 TEUs, bolstered by robust volumes in the second half of 2025.<br \/>\nDemand for Canadian energy products remained steady, with AltaGas\u2019 Ridley Island Propane Export Terminal shipping nearly 2.4 million tonnes of liquified petroleum gas (LPG) to markets in Asia, representing a six percent increase year-over-year. Pembina\u2019s Watson Island LPG Bulk Terminal handled 506,159 tonnes, marking a one percent increase. Volumes through Drax\u2019s Westview Wood Pellet Terminal went up three percent, with close to 1.3 million tonnes of biofuel flowing through the facility.<br \/>\nAnother solid crop year led Prince Rupert Grain Terminal to increase its exports of western Canadian agricultural products by eight percent compared to 2024. Total coal export volumes rose 18 percent at Trigon Pacific Terminals, with metallurgical and thermal coal rebounding, up 26 and 21 percent. Cruise tourism was up 14 percent, with Prince Rupert welcoming 67,771 passengers.<br \/>\nBeyond the strong operational performance in 2025, the Port of Prince Rupert made considerable progress on several major projects that enable valuable new cargoes and enhance the capacities and capabilities of intermodal logistics. These infrastructure projects account for more than $3 billion in capital investment and will begin coming online in mid-2026 to further diversify exports, maximize supply chain efficiency, and grow overall cargo volumes<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Port of Prince Rupert handled 26.3 million tonnes of cargo in 2025, a 14 percent increase over 2024, during<\/p>\n","protected":false},"author":9,"featured_media":22311,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[4],"tags":[],"class_list":["post-22310","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/01\/Port-of-Prince-Rupert-2026.jpg?fit=640%2C356&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/paPyrk-5NQ","jetpack-related-posts":[{"id":21189,"url":"https:\/\/projectcargoglobal.com\/?p=21189","url_meta":{"origin":22310,"position":0},"title":"Ports of Stockholm expands services at Norvik Port","author":"Project Cargo Global","date":"September 11, 2025","format":false,"excerpt":"Ports of Stockholm is expanding its services at Stockholm Norvik Port with a modern goods terminal and bonded warehouse. The facility offers great flexibility and enables the handling of different types of goods. Ports of Stockholm has invested in a modern facility at Stockholm Norvik Port that offers a combination\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2025\/09\/Port-of-Stockholm-Norvik-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2025\/09\/Port-of-Stockholm-Norvik-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2025\/09\/Port-of-Stockholm-Norvik-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":22547,"url":"https:\/\/projectcargoglobal.com\/?p=22547","url_meta":{"origin":22310,"position":1},"title":"Broekman&#8217;s Project Logistics team manages full-scope handling of steel plates","author":"Project Cargo Global","date":"February 19, 2026","format":false,"excerpt":"Discover how our Project Logistics team expertly managed the full\u2011scope handling of 151 heavy steel plates at our Broekman Project Services terminal in Rotterdam. From barge discharge to part\u2011charter loading for onward shipment to Malaysia, this case highlights the precision, coordination and specialised expertise behind our complex cargo operations. We\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Broekman-Malaysia-scope.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Broekman-Malaysia-scope.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Broekman-Malaysia-scope.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":22576,"url":"https:\/\/projectcargoglobal.com\/?p=22576","url_meta":{"origin":22310,"position":2},"title":"Timeline Logistics completes oversized transport","author":"Project Cargo Global","date":"February 23, 2026","format":false,"excerpt":"Timeline Logistics Solutions SAC, a Project Logistics Alliance member representing Peru, has once again proven its strength in handling complex Out of Gauge cargo with precision and efficiency. In this latest case study, the team successfully managed the receipt and delivery of a Terminal Truck destined for the New Chancay\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Timeline-oversized-transport-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Timeline-oversized-transport-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Timeline-oversized-transport-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":22541,"url":"https:\/\/projectcargoglobal.com\/?p=22541","url_meta":{"origin":22310,"position":3},"title":"Kalmar introduces the TT7 terminal tractor","author":"Project Cargo Global","date":"February 18, 2026","format":false,"excerpt":"Kalmar is proud to announce the launch of the TT7 series terminal tractor. Specifically designed for the demanding requirements of customers in the European market, the TT7 series is a robust and reliable solution for port terminal, yard, distribution, and logistics operations. The Kalmar TT7 has been re-engineered based on\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Kalmar-TT7.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Kalmar-TT7.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Kalmar-TT7.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":20770,"url":"https:\/\/projectcargoglobal.com\/?p=20770","url_meta":{"origin":22310,"position":4},"title":"&#8220;K&#8221; LINE participates in the Fire Drill Exercise in Thailand","author":"Project Cargo Global","date":"July 29, 2025","format":false,"excerpt":"On June 24, 2025, Kawasaki Kisen Kaisha, Ltd. (\u201cK\u201d LINE) participated in the \u201cFire Drill Exercise on Board 2025\u201d held at Berth A5 of Namyong Terminal PCL in Laem Chabang Port, Thailand. The drill was conducted to simulate a realistic onboard emergency in order to verify inter-agency coordination and strengthen\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":22492,"url":"https:\/\/projectcargoglobal.com\/?p=22492","url_meta":{"origin":22310,"position":5},"title":"Huisman signs second contract with ECT","author":"Project Cargo Global","date":"February 11, 2026","format":false,"excerpt":"Huisman has signed a second contract with Hutchison Ports ECT Rotterdam (ECT) for the delivery of 12 additional Automated Stacking Cranes (ASCs), following the earlier delivery of a series of six. Of the initial series, three cranes are already operational, while the remaining three are in the commissioning and testing\u2026","rel":"","context":"In &quot;Latest News&quot;","block_context":{"text":"Latest News","link":"https:\/\/projectcargoglobal.com\/?cat=4"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Huisman-ECT-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Huisman-ECT-.jpeg?fit=640%2C356&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/projectcargoglobal.com\/wp-content\/uploads\/2026\/02\/Huisman-ECT-.jpeg?fit=640%2C356&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts\/22310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22310"}],"version-history":[{"count":1,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts\/22310\/revisions"}],"predecessor-version":[{"id":22312,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/posts\/22310\/revisions\/22312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=\/wp\/v2\/media\/22311"}],"wp:attachment":[{"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projectcargoglobal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}